01 — Site profile
The asset under file.
Average daily volume0.9M gal / yr
Captive traffic55%
Vehicle traffic7,800 vehicles / day
Lease structure8y NNN · 2× 5y options
Build footprint320 sq ft compact insert
Adjacent brandsCircle K adj · regional QSR
02 — Revenue model
What the line must clear.
Daily target$410
Daily floor$320
COGS ceiling33%
Contribution margin38%
Monthly net / seat$3.0k
Annual net / seat$35.8k
03 — Capital breakdown
Every line on the wire.
- Build-out & permits$34,000
- Kitchen equipment$32,000
- Smart CCTV + POS stack$11,000
- Brand kit & signage$7,000
- Working capital (90d)$14,000
- Royalty deposit$5,000
- Contingency 2%$2,000
- Total$105k
04 — Investor structure
Four seats. Twenty-five percent each.
Seat 01Locked25% · $26.3k
Seat 02Available25% · $26.3k
Seat 03Available25% · $26.3k
Seat 04Available25% · $26.3k
Capital per seat$26.3k
Discipline floor75 / 100
Each seat mustTake shifts as Manager-Operator OR commit a Ölmez Franchise Systems-trained pro manager
Asset darknessNever permitted at any tier
You can outsource work. You cannot outsource accountability.
05 — Operator requirements
What every seat must clear.
- Smart Discipline Score ≥ 75 / 100
- Compact-unit operator certification
- Single-protein menu lock acceptance
- Personal background filing + SOFI verification
06 — Deployment timeline
From qualification to steady-state.
- T+0Day 0
Qualification clears · seats locked
- T+12Week 2
Design Session · compact-build lock
- T+38Week 5–6
Build-out · compact install
- T+55Week 8
Soft launch · Launch LiveOps on-site
- T+115Month 4
Remote LiveOps transition
07 — LiveOps coverage
The line stays awake.
- Launch LiveOps · 45 days on-site (included)
- Remote LiveOps · $1,500 / mo from month 3
- On-site reactivation if score drops below 70
08 — Risk profile
Filed plainly, mitigated upstream.
- Lower-tier corridor revenue ceilingMedium
Compact build keeps payback tight
- Compact menu monotony riskLow
Single-recipe doctrine · brand consistency
- First-cycle Carolinas territoryMedium
Founder remote oversight
09 — Documentation
What every qualified seat receives.
- Letter of Intent · operator co-signature
- 8-year NNN lease · executed copy
- P&L pro forma · 36-month model
- Compact design pack
- AFFAREM access credentials · all six rooms
Reserve · NC-GAS-007
